Add Castle documentation content
- Emergency procedures (fire, medical, weather, utilities) - Equipment guides (tractor, heating, kitchen, tools) - Getting started (house rules, FAQ, supplies) - Infrastructure docs (electrical, water, internet, heating) - Spaces overview (main building, outbuildings, outdoor)
This commit is contained in:
parent
222b641084
commit
3d8425e14f
65 changed files with 3836 additions and 0 deletions
286
content/equipment/heating/wood-fire-heater.md
Normal file
286
content/equipment/heating/wood-fire-heater.md
Normal file
|
|
@ -0,0 +1,286 @@
|
|||
---
|
||||
title: Wood Fire Heater (GBT Boiler)
|
||||
description: Complete operating guide for the GBT wood-fired boiler
|
||||
tags:
|
||||
- equipment
|
||||
- heating
|
||||
- wood-fire
|
||||
- priority
|
||||
aliases:
|
||||
- GBT Boiler
|
||||
- Wood Boiler
|
||||
---
|
||||
|
||||
# Wood Fire Heater (GBT Boiler)
|
||||
|
||||
> [!info] This is the primary heat source for the property
|
||||
|
||||
## Quick Reference
|
||||
|
||||
| Item | Details |
|
||||
|------|---------|
|
||||
| **Location** | *TBD* |
|
||||
| **Make/Model** | GBT Wood Boiler (Geminox) |
|
||||
| **Firewood Location** | *TBD* |
|
||||
| **Min Water Temp** | 70°C (to prevent tar/condensation) |
|
||||
|
||||
---
|
||||
|
||||
## How to Start the Boiler
|
||||
|
||||
> [!warning] Before You Begin
|
||||
> 1. Check water pressure gauge reads **above 1 bar** (when cold)
|
||||
> 2. Confirm boiler has electrical power
|
||||
|
||||
### Step-by-Step Startup
|
||||
|
||||
**1. PUSH the [bypass lever (#3)](#boiler-components)** (opens flue gas bypass)
|
||||
|
||||
![[flue-open.jpg|200]]
|
||||
|
||||
**2. OPEN [loading door (#4)](#boiler-components)** → add paper, kindling, then logs
|
||||
|
||||
**3. LIGHT the paper**
|
||||
|
||||
**4. OPEN [ash door (#7)](#boiler-components) slightly** (improves draft)
|
||||
|
||||
**5. WAIT a few minutes** until fire catches
|
||||
|
||||
**6. CLOSE [ash door (#7)](#boiler-components)**
|
||||
|
||||
**7. PULL [bypass lever (#3)](#boiler-components) toward you** (closes bypass)
|
||||
|
||||
![[flue-closed.jpg|200]]
|
||||
|
||||
**8. TURN ON [main switch (#8)](#boiler-components)** (orange light illuminates)
|
||||
|
||||
**9. ADJUST [temperature knob (#5)](#boiler-components)** (keep above 70°C)
|
||||
|
||||
> [!danger] Never use liquid fuel (gasoline, lighter fluid) to light the boiler
|
||||
|
||||
---
|
||||
|
||||
## Boiler Components
|
||||
|
||||
![[boiler-front-view.png]]
|
||||
|
||||
| # | Component | Purpose |
|
||||
|---|-----------|---------|
|
||||
| 1 | **Loading door handle** | Opens door to add wood |
|
||||
| 2 | **Thermometer** | Shows boiler water temperature |
|
||||
| 3 | **Bypass lever** | Push to open, pull to close (see below) |
|
||||
| 4 | **Loading door** | Add wood here (top front) |
|
||||
| 5 | **Temperature knob** | Left = cooler, Right = hotter |
|
||||
| 6 | **Secondary air adjustment** | Fine-tune combustion (2 screws) |
|
||||
| 7 | **Ash door handle** | Opens door to access ash pan |
|
||||
| 8 | **Main switch** | On/Off - orange light when on |
|
||||
| 9 | **Primary air adjustment** | Controls main air flow |
|
||||
| 10 | **Flame sight glass** | View fire through ash door |
|
||||
|
||||
### Bypass Lever Positions
|
||||
|
||||
| OPEN (for lighting/reloading) | CLOSED (normal operation) |
|
||||
|:-----------------------------:|:-------------------------:|
|
||||
| ![[flue-open.png\|150]] | ![[flue-closed.png\|150]] |
|
||||
| Push lever **away** from you | Pull lever **toward** you |
|
||||
|
||||
---
|
||||
|
||||
## Reloading Wood (Fire Already Burning)
|
||||
|
||||
1. **PUSH** the bypass lever (opens bypass)
|
||||
2. Open loading door
|
||||
3. Add wood **moderately** - prefer 3-4 small loads over 2 large ones
|
||||
4. Close loading door
|
||||
5. **PULL** bypass lever toward you (closes bypass)
|
||||
|
||||
> [!tip] Mid-season advice
|
||||
> Don't overload the boiler, especially in mild weather. Smaller, more frequent loads are better.
|
||||
|
||||
---
|
||||
|
||||
## Temperature Adjustment
|
||||
|
||||
### Boiler Water Temperature
|
||||
- Turn the **temperature adjustment knob**:
|
||||
- **Left** = decrease (-)
|
||||
- **Right** = increase (+)
|
||||
- **Keep temperature at or above 70°C** to prevent tar buildup and condensation
|
||||
|
||||
### Room/Radiator Temperature
|
||||
- Adjust the **mixing valve** on your heating circuit (not on the boiler itself)
|
||||
- Turn gradually from minimum toward maximum until comfortable
|
||||
|
||||
---
|
||||
|
||||
## Air Controls (Fine-Tuning)
|
||||
|
||||
### Primary Air (Main Adjustment)
|
||||
- **Air control adjustment knob** on front
|
||||
- Left = less air (slower burn)
|
||||
- Right = more air (faster burn)
|
||||
- Goal: maintain glowing ember bed
|
||||
|
||||
### Secondary Air (Combustion Quality)
|
||||
- Two adjustment screws near ash door
|
||||
- **Right** = decrease air
|
||||
- **Left** = increase air
|
||||
- Adjust with ash door closed
|
||||
- Check flame through sight glass - should be neither too weak nor too harsh
|
||||
|
||||
---
|
||||
|
||||
## Shutting Down the Boiler
|
||||
|
||||
1. Press main switch to **STOP** position (orange light goes out)
|
||||
2. **Keep doors open** to ventilate the interior
|
||||
3. Allow to cool completely
|
||||
|
||||
> [!warning] Frost Protection
|
||||
> If the building may be exposed to freezing temperatures, contact a qualified professional to add antifreeze or drain the heating circuit.
|
||||
|
||||
---
|
||||
|
||||
## Summer Operation
|
||||
|
||||
### If Connected to Hot Water Tank
|
||||
- Set mixing valve to **minimum** position
|
||||
- Keep boiler temp at/above 70°C
|
||||
- Make 1-2 good batches of dry wood per day rather than continuous low operation
|
||||
- Adjust hot water temp via thermostat on the tank
|
||||
|
||||
### If NOT Connected to Hot Water Tank
|
||||
- **Stop the boiler** (see shutdown procedure above)
|
||||
- Leave doors open for ventilation
|
||||
|
||||
### Prevent Mixing Valve Jamming
|
||||
> [!warning] Important
|
||||
> During summer, **manually operate the mixing valve 3 times** to prevent jamming.
|
||||
|
||||
---
|
||||
|
||||
## Firewood Requirements
|
||||
|
||||
> [!tip] Wood Quality is Critical
|
||||
> Use the **driest wood possible**: 2 years seasoning, including 1 year under shelter
|
||||
|
||||
### Recommended Wood Types
|
||||
| Type | Quality |
|
||||
|------|---------|
|
||||
| Oak | Excellent |
|
||||
| Hornbeam (Charm) | Excellent |
|
||||
| Beech | Excellent |
|
||||
| Maple | Excellent |
|
||||
| Fruit trees | Good (except cherry & plum) |
|
||||
|
||||
### Log Sizes
|
||||
| Model | Max Log Length |
|
||||
|-------|----------------|
|
||||
| GBT 20 | 50 cm |
|
||||
| GBT 30/50 | 70 cm |
|
||||
|
||||
### Storage Location
|
||||
*TBD - Add firewood storage location*
|
||||
|
||||
---
|
||||
|
||||
## Maintenance Schedule
|
||||
|
||||
### Daily
|
||||
- [ ] Remove ashes from ash pan
|
||||
|
||||
### Weekly
|
||||
- [ ] Check central orifice between combustion chamber and loading area is clear
|
||||
- [ ] Remove ash pan and clean exchanger fins with metal brush
|
||||
- [ ] Clean flame sight glass if needed
|
||||
|
||||
### Quarterly
|
||||
- [ ] Disassemble and clean smoke box (4 screws attach it to boiler body)
|
||||
|
||||
### Twice Yearly (Mid-season & End of Season)
|
||||
- [ ] Have installer/service check and clean:
|
||||
- Fan cleanliness
|
||||
- Air passage openings
|
||||
- Joint/seal condition
|
||||
- [ ] End of season: complete cleaning, leave doors open for ventilation
|
||||
|
||||
### Annually
|
||||
- [ ] Professional inspection of all adjustment and safety components
|
||||
- [ ] Chimney flue cleaning and verification
|
||||
|
||||
> [!warning] Adding Water Frequently?
|
||||
> If you need to regularly add water to your heating circuit, call a qualified professional immediately.
|
||||
|
||||
---
|
||||
|
||||
## Troubleshooting
|
||||
|
||||
| Problem | What to Check | Solution |
|
||||
|---------|---------------|----------|
|
||||
| No heating | Wood supply | Ensure boiler has wood |
|
||||
| No heating | Mixing valve position | Move from minimum toward maximum |
|
||||
| Heating but no hot water | Hot water system | Call qualified professional |
|
||||
| Hot water but no heating | Mixing valve | Check it's not on minimum |
|
||||
| Smoke in room | Bypass lever | Push open before lighting/loading |
|
||||
| Poor combustion | Wood moisture | Use drier, well-seasoned wood |
|
||||
| Tar buildup | Temperature too low | Keep boiler water above 70°C |
|
||||
| Tar buildup | Wet wood | Use properly seasoned wood |
|
||||
|
||||
---
|
||||
|
||||
## Emergency Procedures
|
||||
|
||||
### Chimney Fire
|
||||
|
||||
> [!danger] Signs of chimney fire
|
||||
> - Loud roaring sound
|
||||
> - Excessive smoke
|
||||
> - Very hot chimney/stovepipe
|
||||
> - Flames visible from chimney top
|
||||
|
||||
**If chimney fire occurs:**
|
||||
1. **Call 112** (fire department)
|
||||
2. Close all air controls
|
||||
3. Get everyone out of building
|
||||
4. **Do not use water on the boiler**
|
||||
|
||||
### Carbon Monoxide
|
||||
- Install CO detector near boiler
|
||||
- **Symptoms:** headache, dizziness, nausea
|
||||
- If alarm sounds or symptoms occur: evacuate and call 112
|
||||
|
||||
### Water Leak
|
||||
- Stop the boiler immediately
|
||||
- Call qualified installer or after-sales service
|
||||
|
||||
---
|
||||
|
||||
## Service Contacts
|
||||
|
||||
| Service | Contact |
|
||||
| ------------------------ | ------------------------- |
|
||||
| After-Sales Service | *TBD - Add local contact* |
|
||||
| Geminox Consumer Service | 08 20 00 60 00 (France) |
|
||||
| Chimney Sweep | *TBD* |
|
||||
| Installer | *TBD* |
|
||||
|
||||
---
|
||||
|
||||
## Safety Reminders
|
||||
|
||||
> [!danger] Critical Safety Rules
|
||||
> - **Never** use liquid fuel to light the boiler
|
||||
> - **Never** overload the boiler, especially mid-season
|
||||
> - **Always** open bypass lever before lighting or reloading
|
||||
> - **Always** keep water temperature at/above 70°C
|
||||
> - **Never** store combustible or corrosive products near boiler
|
||||
> - **Never** block ventilation openings in the boiler room
|
||||
> - Only qualified professionals may work inside the boiler
|
||||
|
||||
---
|
||||
|
||||
## Related Pages
|
||||
|
||||
- [[heating-system|Heating System Overview]]
|
||||
- [[fire|Fire Emergency Procedures]]
|
||||
- [[power-outage|Power Outage]] - Heat during outages
|
||||
Loading…
Add table
Add a link
Reference in a new issue