The forgejo-sandbox / reforge harness, lifted out of the machine config into a host-agnostic, generic engine anyone can consume with Nix. Two layers: - engine (this repo) — nixosModules.reforge stands up the sandbox forge, provisions role accounts + tokens, enforces branch protection, and puts the reforge-* CLI + forgejo-mcp on PATH. Carries no project specifics. - run config — per-project manifest/charter/agenda/issues an adopter fills in; scaffold one with the `reforge` flake template. Portability fixes vs the in-config version: - forgejo-mcp resolved from $REFORGE_MCP_BIN or PATH, never a named host (kills the nixosConfigurations.omni hardcode). - all instance data + paths parameterized via REFORGE_* env, baked into the reforge-scripts wrappers from module options (configDir, agentsDir, refsDir, org, port, tokenOwner, ...). - option namespace neutral (reforge.* not omni.packs.*); settings policies carry no absolute /etc/nixos paths. - role briefs + orchestrator playbook genericized: all project specifics point at the charter; refs corpus optional. Validated: nix flake check (eval) + builds of forgejo-mcp, reforge-scripts, and a module-eval check. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
1.3 KiB
1.3 KiB
Run agenda —
Everything this particular run must address. Group items and give each a
short id (A1, B2, …) so issues and reviews can trace back to it. The
machine-readable twin of this file is issues.tsv (what reforge-kickoff
files as issues) — keep the two in sync.
A. Production-readiness
- A1 — Security audit per repo (auth, key custody, secrets, injection).
- A2 — Bug hunt on the critical paths.
- A3 — Refactor opportunities that are cheap now, expensive after release (strict-from-the-start — no compatibility shims pre-launch).
- A4 — Test-coverage review against the charter's test harness.
- A5 — Synthesize
GAMEPLAN.md: what stands between this stack and production-ready, ordered, with owners. (PR into the charter repo.)
B.
- e.g. an architectural evolution the run should evaluate and stage as tracked divergences in Phase B.
C. Coherence
- C1 — Map every inter-component contract (who calls whom, over what).
- C2 — Check each contract against the charter's boundary principles.
Outputs (deliverables of the run)
- Issues traceable to these agenda items.
- Reviews on every PR (security + charter, plus any project lens).
GAMEPLAN.mdPR'd into the charter repo.